İş Yerinde
İş Yerinde
Full-Time
Specialist
Engineering
Engineering
597 application
Full-Time
Specialist
597 application
Engineering
LOOKING FOR FULL TIME TECHNICAL OFFICE / REPORTING ENGINEER AT OUR ISTANBUL FINANCE CENTER PROJECT IN ATASEHIR, ISTANBUL
Position Description:
Prepare and maintain project reports and review project baselines, monitor and track progress. Supports project(s) in all other aspects of reporting analysis and special studies. Supports Technical Office activities as related to project.
Essential Duties and Key Responsibilities:
In the areas assigned:
Qualifications:
Physical Demands:
The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Performance of the required duties will require physical ability to climb permanent and temporary stairs, passenger use of construction personnel hoists, ability to climb ladders and negotiate work areas under construction. Specific vision abilities required by this job include close vision, peripheral vision, depth perception, and the ability to adjust focus. Performing
this job requires use of hands to finger, handle, or feel objects, tools or controls, sit, talk and hear, stand, climb, balance, stoop, kneel, crouch, or crawl. Employee must occasionally lift and/or move heavy weight.
Work Environment:
The work environment characteristics described here are representative of those an employee encounters while performing the essential functions of the job. Reasonable accommodations may be made to enable individuals with disabilities to perform essential functions. While performing the duties of this job, the employee will work on-site at the construction work site where the employee is exposed to moving mechanical parts; high precarious places; fumes or airborne particles; outside weather conditions and risk of electrical shock. The noise in these work environments is usually moderate to very loud.
Teknik Ofis Mühendisi pozisyonu ile ilgili daha detaylı bilgi almak ya da diğer iş fırsatlarını incelemek için aşağıdaki sayfaları inceleyebilirsiniz.
Teknik Ofis Mühendisi Teknik Ofis Mühendisi Maaşları Teknik Ofis Mühendisi Nasıl Olunur? Teknik Ofis Mühendisi Nedir? Teknik Ofis Mühendisi İş İlanlarıÖzel Sağlık Sigortası.
Teknik Ofis Mühendisi pozisyonu ile ilgili daha detaylı bilgi almak ya da diğer iş fırsatlarını incelemek için aşağıdaki sayfaları inceleyebilirsiniz.
Teknik Ofis Mühendisi Teknik Ofis Mühendisi Maaşları Teknik Ofis Mühendisi Nasıl Olunur? Teknik Ofis Mühendisi Nedir? Teknik Ofis Mühendisi İş İlanları